Hamilton Terrace – Resin Injection

Project Info

  • Construction Date

    May 2016

  • Category

    Resin Injection, Waterproofing

Excel Waterproofing were instructed to resin inject the under pinning construction joints using Koster KB 2 in 1, this was to stop the constant flow of water entering, which could potentially cause defects to the Delta Cavity drain system that we installed.

The koster 2 in 1 forms an elastic foam, that when comes into contact with water, pushes the water out of the crack.